He additional that Period two would include the stretch in the Lekki second toll gate for the Ajah beneath-bridge and can be divided into four sections. “Motorists from Ajah inward Lekki are going to be diverted to at least one lane while repairs are ongoing on one other lane,” Osiyemi https://tonye319ocn6.mysticwiki.com/user