Where will it be located? Preferably The situation will be shaded and close to your switchboard. If it’s not shaded, a cover could possibly be required. When will it's, how long will it just take and what's going to happen on the working day? When will the accredited installer be https://totalsolar.com.au/13-2kw-solar-system/