The peak of the ground beam normally relies on the predicted volume of the bottom floor slab. I have seen a great number of configurations. In some cases, the top with the beam flushes Along with the major from the pile cap, although in some cases it rises earlier mentioned https://roberte445hcx0.blog-ezine.com/profile