If you're undertaking a pressure system or stress shutoff then the answer is always Sure. The pump has no Check out valve and 1 is required to build stress. Should you have a really future over the surface area then including just one just higher than the pump is ideal. https://steeleh048eow3.angelinsblog.com/29052944/titan-solar-power-jobs-no-further-a-mystery